BB-7 - With the final two bulkheads set in the jig...
it was ready to skin the sides and start installing the splash rail. In this picture I am setting its final position of the splash rail. I used two 17’ X ¾” mahogany planks. I stripped them to an inch and a half wide and I will laminate (stack) 4 on each side of the hull to make a splash rail that projects 3” from the hull and is 1.5” thick. |
© Copyright 2010 - All Rights Reserved
Terms Of Use |
Go To Bradley's Offshore Adventures |